🏝️ Park Designer

Design a Theme Park — mission map

Design a theme park that is thrilling, safe and makes enough money to stay open.

0 of 6 required missions · 0% complete
Parent review

Offline learning

92% (289 min)

Outdoor time

20 min

Missions

10 (6 required)

Up next

Ride research

List the kinds of rides a park needs for every age group.

Start mission
  1. 📖

    Island 1 · Read aloud

    Ride research

    List the kinds of rides a park needs for every age group.

    30 min
  2. Island 2 · Draw something

    Park map

    Draw your park to scale with zones, paths and facilities.

    45 minLocked
  3. Island 3 · Draw something

    Design your headline ride

    Draw and label your best ride, including its safety features.

    45 minLocked
  4. Island 4 · Conduct an experiment

    Crowd test

    Work out queue times if 500 people arrive at once.

    30 min Adult nearbyLocked
  5. Island 5 · Design something

    Fix the bottleneck

    Change your layout to fix the worst queue.

    25 minLocked Optional
  6. Island 6 · Measure something

    Investor pitch

    Pitch your park: tickets, costs and why people will come.

    30 minLocked
  7. Island 7 · Design something

    Designer's notes

    What was the hardest trade-off you made?

    15 minLocked Optional
  8. Island 8 · Explore outdoors

    Take it outside

    Go outside for at least 15 minutes and find one real thing that connects to your project. Sketch it or photograph it.

    20 min OutdoorsLocked Optional
  9. Island 9 · Teach another person

    Teach someone what you know

    Pick one big idea and teach it to someone at home. No notes allowed!

    15 minLocked Optional
  10. Island 10 · Present a final creation 🏁

    Final Challenge: A scaled park map, headline ride design and investor pitch.

    This is the big one. Finish a scaled park map, headline ride design and investor pitch. and show it to your family.

    60 minLocked